MORE DETAILS COMING SOON
Phase I — 362,000 SF with occupancy Q4 2023 | Phase II — 378,000 SF with occupancy Q4 2024
Phase I — 362,000 SF with occupancy Q4 2023
Phase II — 378,000 SF with occupancy Q4 2024
Avonhead Industrial Campus will feature:

Targeting Zero Carbon Design

Targeting LEED Gold Certification

Oversized Power (10,000 amps for the site)

Estimated Energy Costs = ~20% annual savings compared to code built equivalent building

Roof-top solar ready

Ventilation upgraded with 90% Efficient Energy Recovery Ventilators and Cold Climate VRF Air Source Heat Pumps
Introducing Avonhead Industrial Campus –
the GTA’s newest zero carbon industrial campus!
The Zero Carbon + LEED Gold development will be built in Mississauga on a speculative basis and consist of two Class A industrial buildings totalling 740,000 sq. ft.
Phase I — 362,000 SF with occupancy Q4 2023
Phase II — 378,000 SF with occupancy Q4 2024
More details to be released shortly
Get in touch with our team to learn more:
LEASING TEAM:
Jonathan Leary*
Executive Vice President [email protected]
Fraser McKenna*
Executive Vice President [email protected]

*Sales Representative