MORE DETAILS COMING SOON

Phase I — 362,000 SF with occupancy Q4 2023     |     Phase II — 378,000 SF with occupancy Q4 2024

Phase I — 362,000 SF with occupancy Q4 2023

Phase II — 378,000 SF with occupancy Q4 2024

Avonhead Industrial Campus will feature:

Targeting Zero Carbon Design

Targeting LEED Gold Certification

Oversized Power (10,000 amps for the site)

Estimated Energy Costs = ~20% annual savings compared to code built equivalent building

Roof-top solar ready

Ventilation upgraded with 90% Efficient Energy Recovery Ventilators and Cold Climate VRF Air Source Heat Pumps

Introducing Avonhead Industrial Campus –
the GTA’s newest zero carbon industrial campus!

The Zero Carbon + LEED Gold development will be built in Mississauga on a speculative basis and consist of two Class A industrial buildings totalling 740,000 sq. ft.

Phase I — 362,000 SF with occupancy Q4 2023

Phase II — 378,000 SF with occupancy Q4 2024

More details to be released shortly

Get in touch with our team to learn more:

LEASING TEAM:

Jonathan Leary*
Executive Vice President [email protected]

Fraser McKenna*
Executive Vice President [email protected]

*Sales Representative

Disclaimer / Terms of Use | Privacy Policy